Case study of 1080㎡ printed travertine wall surfaces in Hangzhou West Lake hotel guest rooms | Five functional surfaces in the same color code

A boutique hotel by West Lake in Hangzhou, where all 36 guest rooms use the same beige-gray horizontal-grain travertine for wall surfaces: headboard backdrop, office and minibar wall, bathroom wall, entryway partition, and living area corner window side—five functional surfaces in the same color code, with wood veneer and metal strips used only for vertical edge trim.

Published time:

A boutique hotel by West Lake in Hangzhou, where all 36 guest rooms use the same beige-gray horizontal-graintravertineFor walls: headboard backgrounds, office and minibar walls, bathroom walls, entryway partitions, living area corner window sides—Five functional surfaces, one color code, the wood veneer and metal strips are only used for vertical edge finishing. The net wall area of guest rooms is about 1,080㎡(36 rooms × approx. 30㎡), the material isPrinted travertineFlexible Stone(Yunyan Sixteen), specifications 1220×2930mmThick 2.5–3.5mmAbout 4.76kg/㎡; implement JG/T 540-2017This page displays 6 sets of space images.

  • 1,080㎡ Wall net area
  • 36 rooms Number of guest rooms
  • 1220×2930mm Panel specifications
  • Approx. 4.76 kg/㎡ Surface weight
  • 342 pieces Actual order quantity
  • 324 locations Wall openings
  • JG/T 540-2017 Implementation standards
Key indicators Values Description
Building form36 guest roomsBoutique hotel, including standard rooms and suites
Net wall area1,080 ㎡36 rooms × about 30 square meters
Material calculation area1,188 ㎡10% wastage (openings + corner wrapping)
Number of pieces to order342 pieces332 pieces + 10 pieces of material
Wall self-weight5.14 Ton4.76kg/㎡ × 1,080 ㎡
Flexible adhesive416 kg0.35kg/㎡ × 1,188 ㎡, about 21 barrels (20kg/barrel)
Wall openings324 locations9 locations × 36 rooms

Regarding the scope of this page: The material specifications, performance parameters, and applicable standards in this article all come from IGOODS product documentation and can be verified item by item. ★Project experience = Common industry practices and experience range, not as a reference for national standards data; ◆Estimate = Estimated value calculated based on the industry's common scale and the scale of this case, used to judge the scale,Not an actual measured bill; actual conditions are subject to project confirmation.

1. The truly difficult part of guest room walls is not the application, but "no color difference across continuous runs"

The wall area of a single guest room is not large; the difficulty is that the same room type must be repeated 36 times. When the doors of the row of rooms are all open, you can see straight down the corridor—If any one room's color is off, it shows across the whole floor.

The real constraints on guest room walls Specific performance Corresponding actions on the plan
Repeated 36 times for the same unit typeThe color difference of wall surfaces in consecutive rooms is multipliedOne-time material preparation for the entire project, same batch, mixed layout
The headboard background is the visual focal pointLongest dwell time; texture and gloss are most likely to be noticedChoose low-contrast horizontal grain and a matte surface to avoid strong reflections
The light strip runs along the wallWall-wash light slots magnify texture defectsLight trough ≥80mm from the panel top; panel surface flatness ≤2mm with a 2m straightedge
Dense cutouts9 outlets/switches/light controls/network ports per roomPosition during the layout stage; cutting openings on site by feel is prohibited
Bathroom adjacent wall affected by moistureThe back is prone to dampness and moldThe material does not absorb water; separate waterproofing is required on the bathroom side
High cleaning frequency, low intensityMainly floating dust and fingerprintsDense surface, wipeable with neutral cleaner

1.1 The plum rain season in Hangzhou is a hidden test for these 36 rooms

This project is in Xihu District. From mid-June to early July is the plum rain season, and indoor relative humidity stays above 80% for long periods. Walls in north-facing rooms get a thin layer of moisture. Guest rooms also run air-conditioning dehumidification for long periods, which means switching back and forth between "high humidity—dry" every day.

The impact of this matter on the finish is not in the material itself (travertine does not absorb water), but inThe cavity behind the panel and the substrate: If panels are installed before the substrate moisture content drops below 8%, moisture gets sealed behind the panels, and once the plum rain season passes, efflorescence may appear at the panel joints. Therefore, the substrate acceptance for this project isMeasure room by roomnot spot-checking—among the 36 rooms, if even one is not fully dry, it will become the first room on the entire floor to develop problems.

II. Why printed travertine · Yunyan Sixteen

2.1 Reasons to choose it

First, the horizontal bedding naturally suits the proportions of guest rooms. Most guest room walls are low walls extending horizontally (headboard backdrops are 1.2–1.4m high); the horizontal bedding of travertine runs in the same direction as this proportion, visually "widening" the wall and making the room feel larger.

Second, greige is the most enduring base color. Cloud Smoke Sixteen is a cool-toned beige gray, with fine pores and dark spots interspersed in the horizontal bedding. This tone has high fault tolerance: it does not feel oppressive when paired with dark wood veneer, does not look dirty when paired with light-colored fabrics, and does not shift color under the cool light of early morning or the warm light of night.

Third, the porous feel is real, not a printed pattern. The surface of printed travertine isFormed by pressing according to the pore distribution of natural travertineyes, it has undulation, and when wall-washing lights shine on it, there will be fine shadows. This makes a big difference in spaces such as guest rooms where "all the lights are on"—flatWood grainUnder the light, the panel looks dead, while travertine looks alive.

2.2 Material performance parameters

Project Parameter description
Composition of materialsComposite of natural mineral raw materials and polymer flexible substrate, an inorganic eco-material
Surface textureFormed by pressing according to the pore distribution of natural travertine, with continuous horizontal bedding and a textured surface
Environmental performanceNo added formaldehyde, no asbestos, meeting conventional environmental requirements for commercial decoration
Combustion performanceFlame retardant;The specific grade shall be subject to the valid test report of the selected model.
Waterproof and moisture-proofThe material does not absorb water, and after construction the wall is less prone to dampness and mold
Anti-crackingThe flexible substrate can absorb minor deformation of the base layer
Can be bentHas a certain flexibility and can bend within a certain radius;The specific radius shall be subject to the model and substrate conditions.
Bonding methodFull-bed adhesion is recommended indoors, with flexible adhesive consumption of about 0.35 kg/㎡
cleaning and maintenanceThe surface is dense; for daily cleaning, wipe with water or a neutral cleaner.

The color number is consistent, relying on material preparation rather than construction

If ordered and installed in batches, the 20th room and the 3rd room are almost certain to be half a color level different. So the approach for this project isStock the full quantity at one time: 1,188㎡ of calculated material area ordered at once; after arrival, mix and arrange by floor, using the same batch of panels for the five faces of the same room.

It is safer to write this clearly in the contract:The same batch for the same room, is the minimum requirement; achieving "same batch for the entire floor" is even better.

A common pitfall: the stone cross grain should be "matching" rather than "seaming"

Travertine's horizontal bedding has a direction: each piece's bedding is a set of parallel lines. If one adjacent piece is laid face-up and the other face-down, the seam forms a chevron-shaped misalignment that looks like a crack from a distance.

The requirement of this project isFull-house laying in the same direction, and make a rough texture alignment at the seams—there is no need to pursue a perfect match like wallpaper, but the density rhythm of the layers must connect. This must be marked on the layout drawing so that workers construct according to the drawing; verbal instructions to "pay attention to grain matching" will definitely go wrong on site.

3. Five functional surfaces, the same color code

Functional surface Area per room Total of 36 rooms Key points of method
Headboard background wall6.5 ㎡234 ㎡Full-height panels to the ceiling, vertical joints evenly spaced at 1.22m
Office and minibar wall5.0 ㎡180 ㎡Interface with wood veneer cabinets; the closure behind the cabinet is not exposed
Bathroom wall (dry area)7.0 ㎡252 ㎡Interface with glass partitions in wet areas; board edges pressed 5 mm
Entryway partition4.0 ㎡144 ㎡Double-sided application, 15 mm edge wrap at corners
Living corner and window-side wall7.5 ㎡270 ㎡Window curtain box lower edge closure, avoiding the curtain track

The effect of five surfaces in the same color is obvious in the image: the first glance upon entering is the travertine of the entryway partition, then further in are the office wall, bathroom, and headboard, finally landing at the living corner—The entire circle is the same material; the room therefore appears complete, rather than "pieced together from several pieces of material".

The opposite approach is also common: travertine at the headboard, ceramic tile in the bathroom, latex paint in the entryway—three or four textures crammed into thirty square meters, and the room immediately feels fragmented.

IV. Joints, light troughs, openings: three things that must be finalized in advance

Control items The method. What happens if you don't do this
Vertical seam alignmentUsing a floor height of 2.9m as the panel height, one panel reaches the top; vertical seams are divided equally at 1.22m, and corners fall onto the edge trimThe joint falls in the center of the sightline, making the room look "fragmented"
Wall-wash light slotLight trough ≥80mm from the panel top; shield inside the trough so the light strip does not shine directly onto the panel surfaceIf too close, a hard band of light will appear, revealing slight unevenness of the panel
CutoutsThe layout drawing marks 9 opening positions; cut openings first, then install on the wallApply first and cut later: the opening edges will be rough, and the seam lines will be forced out of alignment by the openings
Internal and external cornersExternal corner 15mm edge wrapping; internal corner leave a 2mm gap and apply same-color sealantDirect butt joint, edge lifting within one year
Cabinet junctionsInstall cabinets first, apply panels up to the cabinet edge, and do not finish the cabinet sidePanels pressing cabinets and cabinets pressing panels can both easily cause cracking

Why is this 80mm of the light trough critical? Wall-washing lights shine upward close to the wall; the closer the light, the more any undulation on the wall surface is magnified into shadow. Travertine itself has ridges and hollows, which is an advantage; however, unevenness of the substrate and misalignment of joints between panels become very glaring within 80mm. Leaving this distance is equivalent to reserving display space for "the material's own texture" and hiding "construction tolerances".

4.1 Why is it 'one piece to the top' instead of splicing up and down?

The guest room floor height is 2.9m, and the panel height is 2.93m, so exactly one panel reaches the ceiling. This dimension is no coincidence; it is the result of prioritizing layout: one panel to the ceiling means no horizontal seams on the headboard backdrop or bathroom walls, only vertical seams at 1.22m intervals.

If changed to two panels joined top and bottom (for example, a room with a floor height of 3.2 m), a horizontal seam at a height of 1.5 m will appear, exactly at eye level when sitting by the bed, which is visually very jarring. For projects with a floor height exceeding 3 m, the method isPushing the horizontal joint above 2.93m, keep it out of sight, then use same-color panels to add a narrow strip above for finishing.

V. Dosage and construction period

Calculation item Formula Result
Net area36 rooms × about 30 square meters1,080 ㎡
Wastage rateFlat surface 8% + openings and corner wrapping weighted10%
Material calculation area1,080 × 1.101,188 ㎡
Theoretical number of panels1,188 ÷ 3.5746332 pieces
Material preparationReserve 3%10 pieces
Place order332 + 10342 pieces
Wall self-weight4.76 × 1,0805.14 Ton
Flexible adhesive0.35 × 1,188416kg, about 21 barrels (20kg/barrel)
Total number of cutouts9 locations × 36 rooms324 locations
Manual pace1,080 ÷ (4 people × 22 days)12.3 square meters per person per day

12.3 square meters per person per day is the normal rhythm of indoor flat walls. The key to the guest room is not speed, it isOrganization orderCabinets, bathroom glass and curtain boxes must be installed first, and panels applied last; otherwise the panels will be damaged by subsequent construction.

VI. Presentation of effects

Hotel guest room headboard feature wall | Printed travertine Yunyan No.16 wall surface and wall-washing light cove
Figure 1 · Headboard feature wall: full panel to ceiling, wall-wash light slot 80mm from panel top, travertine pores forming fine shadows under the light
Hotel guest room office and minibar area | Travertine wall paired with wood veneer cabinets and shelf lighting
Figure 2 · Office and mini bar wall: travertine and dark wood finish layered vertically, shelf light strips set on the travertine
Hotel guest room bathroom | Full travertine wall with double round mirrors and freestanding bathtub
Fig. 3 · Bathroom dry area: full-wall travertine + double round mirrors, panel joints kept off the mirror centerline
Hotel guest room entryway | Travertine partition wall and dressing table
Figure 4 · Entryway partition: double-sided application, 15mm edge wrapping at the corner, this travertine is the first thing you see upon entering
Hotel guest room sitting corner | Travertine wall with sofa and decorative painting
Figure 5 · Living corner: travertine wall as the sofa backdrop, its horizontal bedding echoing the length of the three-seater sofa
Hotel guest room balcony | Travertine wall with wood grilles and rattan chairs
Figure 6 · Balcony leisure area: the same color number travertine is also used on the exterior wall side, so there is no material discontinuity between indoors and outdoors

The above images are effect illustrations of material combinations and spatial applications, used to show how this color code performs in a guest room setting; actual color codes, textures, and on-site appearance are subject to the physical sample.

Seven, daily maintenance of guest rooms

  • Dust and fingerprints: Guest room walls mainly see these two types of stains; wiping with a slightly damp soft cloth is sufficient, no special cleaner needed. The headboard background is where handprints concentrate most.
  • Dust accumulation in the light trough: Wall-washing light troughs are dust traps. It is recommended to clean them together with deep guest room cleaning (generally quarterly); otherwise, when the light is on, a line of dust will be visible at the trough opening.
  • Bathroom adjacent wall: In dry areas, travertine itself does not absorb water, but waterproofing on the bathroom side must be fully done. Check by looking for blackened panel joints and bulging on the panel surface.
  • Do not use solvents: The pores on the travertine surface are embossed reliefs; strong solvents will remain in the recesses and form stains over time.

VIII. Common questions (FAQ)

How many boards are needed for 1,080㎡?

At 10% waste, 1,188㎡, equivalent to 1220×2930mm panels 332 pieces; additionally prepare 10 pieces,Place order for 342 pieces. The wall weighs approximately 5.14 tons.

Will there be color differences in 36 rooms?

Yes, if ordered in batches. The approach is to prepare all materials for the whole project at once, mix and arrange by floor, and use the same batch of panels for the five faces of the same room. It is recommended to specify "same room, same batch" in the contract.

Are travertine's pores easy to clean?

The holes are shallow embossed recesses, not through-holes, and will not harbor dirt. Daily cleaning with a slightly damp soft cloth is sufficient; avoid strong solvents and abrasive cleaners.

Why should the light trough be 80mm from the top of the panel?

When a wall-wash light shines close to the wall, the closer it is, the more obvious substrate unevenness and joint misalignment become. Leaving 80 mm is equivalent to leaving a display distance for the material's own texture, hiding construction tolerances.

Can guest rooms be paneled first and then have cabinets installed?

Not recommended. Cabinets, bathroom glass, and curtain boxes should be installed first, with panels applied last. Otherwise, secondary work will damage the panel surface, and the color difference of repairs will be more obvious than on the original panel.

How can cutouts be made without damaging the texture?

During the layout stage, put the positions of the 9 openings onto the drawings, and cut the openings before installing on the wall. Cutting openings on site by feel results in rough hole edges, and the joint lines will also be forced into irregularity by the openings.

IX. Project File and Contact Information

Project Content
Project locationXihu District, Hangzhou, Zhejiang Province
Space typeBoutiqueHotel guest rooms(36 rooms, standard rooms and suites)
Application locationHeadboard background, office and minibar wall, dry bathroom area, entryway partition, sitting corner and window side
Materials usedPrinted travertine flexible stone (Yunyan Sixteen)
Material specifications1220×2930mm, thickness 2.5–3.5mm, single piece 3.5746 m², about 17kg per sheet
Wall areaApprox. 1,080㎡ (◆Estimate)
Material quantity1,188㎡ (including 10% loss) ≈ 332 pieces, another 10 pieces, order 342 pieces
Key structural pointsFull height in one piece, vertical joints evenly divided at 1.22 m; wall-washing light groove 80 mm from the top of the panel; 324 openings laid out and positioned; 15 mm wrapping at external corners
Construction processFull bonding method, indoor flexible adhesive 0.35kg/㎡
Construction period4 people, 22 workdays (estimate)
Implementation standardsJG/T 540-2017 'Building Flexible Stone-faced Decorative Material'

Similar projects can be found at Hotel guest rooms with Hotel homestay View column; for material colors see Printed travertine Product page; for light trough and finishing details see Selection GuidesIf you need samples or a project quotation, you can contact us via Contact Us Submit project conditions.

Scope note: The areas in this text are net guest room wall areas; loss, schedule, and labor pace are empirical values from similar projects (◆budget estimate), and actual values are subject to the contract and site conditions; material performance is subject to the valid test report for the selected model.

Find the appropriate wall expression for your project.

Provide the type of space, wall area, and design intention. Communicate about materials, samples, and quotations.

Consulting project material selection ↗
Contact phone number Product Catalog Free Sample
WeChat ID copied