Coffee Shop Front
Includes the coffee and dessert shop front cases of EIGOODS. The page explains that the coffee shop front is a typical small-scale semi-outdoor interface: it must be durable (weather-resistant adhesive + waterproof edge), and it must also convey the brand character within the limited scale, with higher accuracy requirements for the closure than large-area engineering. And give verifiable control points: the flatness of the base layer is according to the 2m rule gap ≤3mm, the sign outline is reserved to avoid the board joint during the layout stage, and the flammability is classified according to GB 8624-2012.
The following cases come from actual engineering projects of IGOODS, which can be cross-referenced with product details and material selection guides.
- Cases implemented
- 3each
- Covered city
- 3each
- Involved part
- Shopfront and side wall of display window
- Check items on this page
- 6Item ·6Item basis
Case index
The table lists the cases of this type by project, city, main materials and construction area, which is convenient for quick positioning by scale and material. The case detail page contains complete material selection basis and construction records.
| Case | City | Main material. | Construction area |
|---|---|---|---|
| Real case of coffee shop shopfront and background wall | Haikou City | Travertine (milky white | 130 m² |
| Cake shop shopfront · Nan Dao Nian Hua Shi real case | Xiamen City | Nan Dao Nian Hua Shi (black and white | 88 ㎡ |
| Coffee shop · Star and Moon Stone wall real case | Qingdao City | Xingyueshi (light color) | 60 square meters |
When viewing these cases, it is recommended to check these 6 items.
Every item comes from a place where a problem has occurred in an actual project. The order of checking is also very important - the judgment of the base and shape comes first, followed by the color.
- The shopfront is the main customer acquisition interface of the coffee shop
Most of the customers of the coffee shop are converted through passing by, so the shopfront must be eye-catching but not cheap. The combination of the matte texture of the material and the light is the decisive factor. - The semi-outdoor interface must be weather-resistant
The shopfront and the lower semi-outdoor wall of the eaves should use weather-resistant adhesive, and the edges should be waterproof treated. - Night and day are two viewing conditions
During the day, the color of the material is seen, and at night, the relationship between the light and the texture is seen. The color selection should be checked under both conditions. - Reserve layout for signboard and light box
Fixed parts pass through the plate into the base layer, and the outline of the signboard should be marked out at the layout stage to avoid fixed points falling on the plate joints. - The storefront is often the same as the indoor background wall
Using the same material for both the interior and exterior can unify the brand image and reduce the variety and loss of materials - Storefront is small, higher precision is required for the closing.
The scale of the coffee shop storefront is small, and the small defects in joints and closures are easily seen from close up, requiring higher construction accuracy than large-area projects
Key indicators and acceptance criteria
The table lists the indicators, reference values and basis that can be checked for the type of this project.★Project experienceIt indicates the range of common practices in the industry and is not used as a reference for national standard data; those with standard numbers can be directly verified.
| Project | Reference value / Practice | Based on |
|---|---|---|
| Substrate flatness | 2m Rule inspection, gaps ≤3mm | ★Engineering Experience; Can be compared with GB 50210-2018 for allowable deviation in the installation of decorative panels |
| Adhesive agent. | Weather-resistant adhesive is used for outdoor and eave areas | ★Engineering experience; select according to product instructions |
| Edge waterproofing. | Waterproof treatment is done at the eaves and edges, and the lower mouth of the board does not directly touch the ground | ★Project experience |
| Reserve for signboard | Reserve for signboard and light box outline during layout, avoid fixing points near board joints | ★Project experience |
| Combustion performance | Graded according to GB 8624-2012, the detection report of the selected model is taken as the standard. | GB 8624-2012 Classification of Combustion Performance of Building Materials and Products |
| Indoor environmental pollution | The indoor part is controlled according to commercial buildings (Class II civil buildings). | GB 50325-2020 Indoor Environmental Pollution Control Standard for Civil Engineering Construction |
Common questions (FAQ) about coffee shop storefronts
The following are the most frequently asked questions in the design and procurement stages of this type of project
What texture is more stable for coffee shop storefronts?
Matte texture with fine texture. It looks clean in the daytime and has layers under the wall washing light at night, which is valid under both conditions
How long will the signboard material become old?
For the signboard constructed according to the weather-resistant aperture, it only needs to be regularly washed in daily life. The part that usually has problems is usually the edge sealing part, and it is enough to check once after the rainy season.
The signboard has not been decided yet, can we paste the wall first?
It is not recommended. The outline of the signboard should be marked during the layout stage, the fixed parts should be inserted into the base layer, avoiding the board joints, and it is easier to penetrate the board after completion.
Will it be too monotonous if the signboard and the store inside use the same style?
No. The same style of full paving depends on the lighting to distinguish the inside and outside, which is more unified; if you worry about monotony, you can use the darker version of the same series to create layers at the signboard.
What should be paid attention to during the construction of a small signboard?
Joint precision. On the small scale facade, the flaws of joints and edges are clearly visible at a close distance, so it is more dependent on layout and matching joint parts.
What inspection documents are needed for the storefront?
The conventional one is the fire performance report (GB 8624-2012 classification). Some cities have additional approval requirements for facade renovation along the street.
Related pages and requests
Overview of coffee and tea beverage cases·Coffee Bar Counter Case·Coffee Backdrop Wall Case·Catering entrance case·Selection Guide
Diameter specification:The indicators listed on this page include★Project experienceThis is a common practice range in the industry, used for estimation and self-check, not as a national standard data reference; those with standard numbers are standard files that can be verified. Material parameters are confirmed according to product archives and orders, and combustion performance and environmental grade are based on the effective inspection report of the selected model.