Hotel guest room 620㎡ Sunset Golden Mountain (golden yellow) wall construction case
IGOODS provided Sunset Golden Mountain (golden yellow) as wall material for a hotel guest room project in Jiangyou City, Sichuan Province, using the full-adhesion method for direct wall application without a furring base. The project's wall surface is estimated at approximately 620㎡, with material specifications of 1220×2930mm, thickness 2.5–3.5mm, and single-piece weight of approximately 17kg, conforming to JG/T 540-2017 "Flexible Stone-like Decorative Facing Materials for Buildings."
IGOODS provided for a hotel guest room project in Jiangyou City, Sichuan Province, Hotel guest rooms Project provided by Sunset Golden Mountain (Golden Yellow) As a wall material, it is applied directly to the wall with the full-adhesion method, with no need for a keel substrate. The project wall budget is about 620㎡, material specifications 1220×2930mm Thickness 2.5–3.5mm The weight of a single piece is about 17kg; implement JG/T 540-2017"Flexible Stone-like Facing Materials for Buildings" The application images in this case total 9 pieces.
- 1220×2930mm Panel specifications
- 2.5–3.5mm thickness
- Approx. 3.2 kg/㎡ Surface weight (converted at 17kg/piece)
- Approx. 620 ㎡ Wall area (◆budget estimate)
- 9 pieces Application image
- JG/T 540-2017 Implementation standards
Project file
| Project item | Content |
|---|---|
| Project type | Hotel guest rooms |
| Application location | Headboard background wall, main wall / side wall, back of wall adjacent to bathroom, corridor / entryway |
| Materials used | Sunset Golden Mountain (Golden Yellow) (Art and Three-Dimensional Texture Series) |
| Material specifications | 1220×2930mm, thickness 2.5–3.5mm, single piece about 17kg |
| Construction process | Full bonding method, direct wall installation after leveling, no keel required |
| Implementation standards | JG/T 540-2017 'Building Flexible Stone-faced Decorative Material' |
| Project location | Jiangyou City, Sichuan Province |
| Wall area | Approx. 620 ㎡ (◆ preliminary estimate) |
| Actual photo record | 9 pieces (on-site shooting) |
Regarding the scope of this page: The material specifications, performance parameters, and applicable standards in this article all come from IGOODS product documentation and can be verified item by item. ★Project experience = Common industry practices and experience range, not as a reference for national standards data; ◆Estimate = Estimated value calculated based on the industry's common scale and the scale of this case, used to judge the scale,Not an actual measured bill; actual conditions are subject to project confirmation.
1. Customer industry usage scenario: the real wall requirements of hotel guest rooms
- The same layout is repeated N times; batch consistency is key The wall area per guest room is not large, but the same room type must be repeated dozens or even hundreds of times. The same wall in the same layout must use the same batch; otherwise adjacent rooms will show a visible color difference.
- The headboard background is the visual focus The headboard background wall bears the visual contact for the longest guest stay time and usually comes with recessed light strips; the material surface needs to be matte, with even texture, and capable of having holes cut for switches and reading lights.
- Dense openings for sockets and switches A standard guest room wall often has 6–10 openings (sockets, switches, lighting controls, network ports). The positions of the openings must be fixed during the layout stage and cannot be decided on site at the last minute.
- High cleaning frequency but low intensity Guest room walls are mainly affected by floating dust and fingerprints; the material surface is dense and can be wiped with a neutral cleaner.
- Moisture-proofing is key for bathroom partition walls The back of walls adjacent to bathrooms is prone to moisture; the material itself not absorbing water and being resistant to mold is a plus.
- The schedule scales linearly with the number of rooms With so many guest rooms, the efficiency of construction organization directly determines the total schedule; lightweight materials, single-person handling and fast installation are important.
II. Material comparison: why Sunset over Golden Mountains (Golden Yellow)
2.1 Why choose the Sunset Gold Mountain (Golden)
The texture of "Sunset Golden Mountain" has the layering and color wash of natural sandstone, Golden yellow Under warm light, the tone presents a gradient similar to sunset—this is exactly where the name comes from. Using this material in guest rooms is equivalent to fixing the emotion of "sunset" onto the wall.
Art and three-dimensional texture series provides Golden yellow, rust red, light brown and other colors, with the rest customizable; the visual tone of this case is based on Gradient golden yellow sandstone tone as the base tone.
2.2 Material performance parameters
| Project | Parameter description |
|---|---|
| Composition of materials | Composite of natural mineral raw materials and polymer flexible substrate, an inorganic eco-material |
| Fabric process | A stone-imitation decorative surface formed by pressing or printing according to the surface texture of the color |
| Environmental performance | No added formaldehyde, no asbestos, meeting conventional environmental requirements for home and commercial decoration |
| Combustion performance | Flame retardant;The specific grade shall be subject to the valid test report of the selected model. |
| Waterproof and moisture-proof | The material does not absorb water, and after construction the wall is less prone to dampness and mold |
| UV resistance and weather resistance | Has UV resistance, high and low temperature resistance and weathering resistance, and can be used for exterior facades. |
| Anti-cracking | Flexible base material can absorb the micro deformation of the base, and the surface is not easy to appear fine cracks |
| Can be bent | The panel has a certain flexibility and can be bent into an arc within a certain radius;The specific radius shall be subject to the model and substrate conditions. |
| Bonding method | Full-bed adhesion is recommended for installation; weather-resistant adhesive is required outdoors |
| Stain resistance and cleaning | The surface is dense and not prone to retaining dirt; for daily cleaning, wipe with water or a neutral cleaner. |
| Implementation standards | JG/T 540-2017 'Building Flexible Stone-faced Decorative Material' |
Specifications and packaging parameters
| Specifications (mm) | Thickness (mm) | Approx. weight per panel (kg) | Wooden crate packaging (pieces/crate) | Area per box (㎡) |
|---|---|---|---|---|
| 1220×2930 | 2.5–3.5 | 17 | 70 | Approx. 250.2 |
The specifications, weights and packaging in the table are reference values; actual values are subject to order confirmation; custom large panels, small panels and special-shaped sizes are supported.
3. Configuration plan
3.1 Allocate materials by spatial function
| Space / Location | Suggested materials | Specifications | Key focus |
|---|---|---|---|
| Headboard background wall | Flexible Stone(key surface) | 1220×2930mm | Light strip slotting, socket openings |
| Main wall / side wall | Flexible stone (same color family) | Same as above | Color difference control for the entire room |
| Back side of bathroom adjacent wall | Flexible Stone | Same as above | Moisture-proof, no mildew |
| Corridor / entryway | Same as above | Same as above | Impact and abrasion resistance, edge finishing |
3.2 Quantity and project schedule estimate
Dosage formula (★engineering experience basis):
Material preparation area = measured net wall area × (1 + loss rate). Loss rate: regular walls 5%–8%; spaces with many corners/openings 10%–15%. Number of wooden crates = material preparation area ÷ 250.2㎡ (rounded up) | Item | Calculation | Result |
|---|---|---|
| Wall area of this project | — | Approx. 620 ㎡ |
| Wastage rate | ★Value by spatial complexity | 10% |
| Material preparation area | 620 × 1.10 | Approx. 682 ㎡ |
| Number of wooden crates | 682 divided by 250.2 → rounded up | 3 boxes |
Construction period estimate (◆ estimate):
| Stage | Schedule |
|---|---|
| Substrate treatment (knock out hollow areas + leveling + drying) | Substrate treatment usually accounts for about 1/3 of the total construction period |
| Layout setting-out | ★The denser the holes, the greater the layout workload |
| Adhesive mounting on wall | ★2 people can complete 60-100㎡ per day in a group; 620㎡ ÷ 80㎡/day ≈ 7 days |
| Finishing · Cleaning · Acceptance | ★Project experience |
| Total (budget estimate) | Approx. 24 days(range 18–30 days) |
Diameter specification: The table above is an estimate calculated by order of magnitude,Excludes time occupied by material transport and coordination with the client: ; the actual schedule is subject to the construction schedule confirmed after on-site survey.
A practical reminder: Flexible stone is made from natural mineral raw materials,Slight color tone differences may exist between different batches, this is a characteristic of the material itself. For large-area projects, it is recommendedStock the full quantity at one time and mix the layout: ; always use the same batch for the same wall in the same space.
3.3 Material Configuration
| Stage | Materials | Function | Basis |
|---|---|---|---|
| Bonding | Special adhesive,Full adhesion method | Ensure the finish and substrate are fully bonded | Product technical requirements; weather-resistant adhesive for outdoor use |
| Substrate | Leveling materials (selected according to substrate condition) | Provide a flat, dry substrate free of hollowing | Substrate flatness directly affects appearance |
| Close up | Edge trim / metal trim | Treat internal and external corners, door frames, and wall base closures | ★Engineering Experience Practices |
| Cutting | Utility knife / special cutting tool | On-site cutting according to the layout drawing | On-site secondary cutting is standard practice |
IV. Construction process and acceptance control points
Flexible stone belongs toRelatively relaxed requirements for construction conditionsa type of material: no keel or complex substrate is required,Once leveling is complete, it can go on the wall—dry adhesion or wet fixing both work. But this does not mean that the process can be skipped.
Step 1 · Base treatment
Adhesive substrates includeCement mortar walls, concrete walls, gypsum board walls, lightweight partition walls, insulated wall surfacesRequirements:dry, free of floating dust, no hollowing: ; if flatness is insufficient, level first; if moisture content is too high, seal the base first.
★Engineering Experience: The most common problems in existing-building renovation projects are hollowing of the old putty layer, local dampness, and non-straight internal and external corners.Hollowing must be removed; otherwise the finish will fall off along with it.
Step 2 · Measurement and layout
It is advisable to put the layout drawing on paper before starting workMark door and window openings, switches and sockets, and internal and external corner positions, and calculate the space occupied by trim strips in advance.Joint lines on different walls within the same space should be aligned as much as possible, the overall visual impression differs greatly.
Step 3 · Cutting
Cut according to the layout drawing; secondary cutting on site is a conventional practice. Flexible stone panels are thin and flexible, making cutting less difficult than ceramic tile or stone, butAvoid repeatedly bending the same area.
Step 4 · Adhesive application and wall installation (full adhesion method)
RecommendedFull adhesion method: Adhesive should be selected according to the product instructions,Full coatingRather than spot application; after installation on the wall, press firmly and release air to ensure there is no cavity between the finish and the substrate.
Regarding curved arcs: Flexible stone can bend within a certain radius,The specific radius shall be subject to the model and substrate conditions.: ; large-radius curves require a mock-up for confirmation first.
Step 5 · Joints and edge finishing
- Tight-joint: The seam lines are the finest, suitable for regular walls;
- Leave a joint + edge trim: High fault tolerance, suitable for spaces with many corners and cutouts;
- Metal trim: Used for closing edges and emphasizing lines.
Step 6 · Cleaning and self-inspection
Check each wall: hollowing, color difference, straightness of joint lines, squareness of openings, and finishing in place.
Step 7 · Delivery acceptance
| Control points | Standard value or practice | Basis |
|---|---|---|
| Substrate dryness / hollowing | dry, free of floating dust, no hollowing; if not compliant, repair first | ★Engineering Experience Practices |
| Substrate flatness | Leveling in place, repair deficiencies first | ★Engineering Experience Practices |
| Bonding method | Full bonding method, adhesive selected according to product instructions | Product technical requirements |
| Material execution standard | JG/T 540-2017 'Building Flexible Stone-faced Decorative Material' | Product execution standard |
| Internal and external corners and closures | Edge trim / metal trim closure, trim straight and true | ★Engineering Experience Practices |
| Cutouts and panels | The cutout position is coaxial with the panel, and the edges are not chipped | ★Engineering Experience Practices |
| Color difference control | Use the same batch of material for the same wall surface in the same space | ★Engineering Experience Practices |
| Joint straightness | Align joint lines within the same space, with no obvious misalignment visually | ★Engineering Experience Practices |
| Environmental protection indicators | No added formaldehyde, no asbestos | Product information (subject to the test report for the model) |
V. Image display and application description
Total application photos of this project 9 pieces; all photographed on site at the project, covering corner curved wall, headboard background, desk area, reading area, walk-in closet, double round-mirror washbasin, entryway and wash area, single-chair lounge corner, guest room headboard (II) and other areas.
VI. Communication and confirmation process
For the wall works of hotel guest room projects, communication mainly centers on three things: whether the material selection matches the spatial character, how the openings and layout are determined, and whether the substrate conditions are met. The following are the key points of the communication process.
Owner: Ours is a hotel guest room, and we want the wall to have the texture a hotel guest room should have. What do you suggest?
IGOODS: It is recommended to first clarify three things: gloss level (matte, not high-gloss), texture strength (weak texture is more enduring), and whether curved shapes are required. For materials in the art and three-dimensional texture series such as Sunset over Golden Mountain (golden yellow), the gradient golden-yellow sandstone tone performs relatively stably and can be adapted.
Owner: How should cutouts and panel joints be handled?
IGOODS: This must be atLayout stageSolve it. We will first map the positions of door and window openings, switches and sockets, and internal and external corners onto the layout drawing, then determine the seam line direction. Deciding on site will force the seam lines to be disrupted by openings, which is the most common appearance problem.
Owner: What should be noted about the base layer?
IGOODS: the base layer mustdry, free of floating dust, no hollowingHollowing must first be removed and re-leveled—the finish is applied on top, and if the substrate is hollow, the finish will fall off with it; walls with excessively high moisture content must be primed and sealed first.
Owner: Will it be easy to clean later?
IGOODS: The surface is dense; for daily cleaning, just wipe with water or a neutral cleaner. Note: do not use strong solvents, and no sanding is needed.
Owner: To what extent is it dirt-resistant and scratch-resistant?
IGOODS: The specific wear resistance and stain resistance indicators shall be subject to the valid test report of the selected model. The material itself is zero formaldehyde, asbestos-free and flame retardant; these can be verified in the product documentation.
What was confirmed in this communication?
- Selection criteria: Determine the direction of matte, textured, bendable materials rather than high-gloss surface materials;
- Layout prerequisites: Doors and windows, openings, and internal and external corners must be positioned during the layout stage, not decided on site at the last minute;
- Substrate prerequisites: Hollowing must be removed and leveling redone, and wall installation is allowed only after moisture content meets the standard;
- Batch control: Use the same batch of material for the same wall surface in the same space to avoid color differences;
- Acceptance Basis: Performance indicators are subject to the valid test report for the selected model; no verbal commitments are made.
Record notes: This section is a summary of key points from the communication process, used to explain how the plan was finalized. The text contains no performance commitments or price commitments;The avatar and nickname are illustrative graphics and do not represent the customer's actual image.
Seven, usage effects and daily maintenance
7.1 What is the perception of space?
Guest room walls become Part of the light source: When the bedside light strip and pendant light shine on the golden sandstone texture, the wall will "tint" the light warm and then diffusely reflect it back, making the room feel warmer in color temperature than the actual fixtures. Combined with the continuous direction of the curved wall and light strip, the space has a strong sense of enclosure.
7.2 Daily maintenance
| Scenario | Treatment method |
|---|---|
| Daily floating dust | dry cloth or feather duster |
| Water stains / beverage stains | Wipe with clean water or neutral detergent |
| Oily stains | Neutral cleaner,Avoid strong solvents |
| Minor scratches | Judged by texture type; textured surfaces themselves are relatively tolerant of minor marks |
| Prohibited practices | Strong acid and strong alkali solvents, steel wool, grinding machines |
Maintenance-related characteristics of the material itself (from product documentation):
- Waterproof and moisture-proof: The material does not absorb water, so walls are less prone to dampness and mold after construction;
- Mildew resistance: Suitable for humid environments and underground spaces; routine maintenance is mainly wiping;
- Anti-crackingThe flexible substrate can absorb minor substrate deformation, making the finish less prone to fine cracks;
- Stain resistance and cleaning: The surface is dense and not prone to staining; daily wiping with water or neutral cleaner is sufficient.
7.3 On-site Recheck After Delivery
| Review items | Inspection content | Basis for determination |
|---|---|---|
| Joints and closures | Whether joint lines are straight, whether lines are aligned, whether corners are properly executed | no obvious misalignment by visual inspection |
| Cutouts and panels | Whether the switch and socket are coaxial with the cutout and whether the edges are chipped | Panel coverage with no exposed edges |
| Whole wall | Whether there is hollowing or obvious color difference | Hollowing rate 0; no visible color difference on the same wall |
Diameter specification: The above are the conventional characteristics of the material itself and the review method.For engineering indicators in specific projects (wear cycles, stain resistance grade, etc.), please refer to the valid test report of the selected model and project technical confirmation.
7.4 Cost Reference
Flexible stone'sPrice range is 25–300 yuan/㎡, the span is relatively large, depending on specifications, thickness, texture process, order quantity, and delivery time.
Cost rough estimate for this project (◆ rough estimate): Apply at 25–300 yuan/㎡ to the budget estimate area:
| Item | Calculation | Result |
|---|---|---|
| Lower limit of material amount | 620 × 25 | Approx. RMB 16,000 |
| Upper limit of material amount | 620 × 300 | Approx. RMB 190,000 |
Why is the range so wide: 25–300 CNY/㎡ covers the full range from economy texture to custom large slabs, the actual unit price depends on specifications, thickness, texture technology, order quantity and delivery time.The actual transaction amount of this project is subject to the contractnot disclosed on this page.
VIII. Common questions (FAQ)
Will a warm color like golden yellow feel cloying in guest rooms?
The key lies in Which wall it is used on In this case, golden sandstone is concentrated on the headboard backdrop and the end-view wall, while the remaining walls keep a light tone in the same color family, so the visual focus is concentrated but not spread over everything. Filling an entire room with highly saturated warm colors is indeed likely to cause fatigue, while zoned use will not.
Curved wall + light strip, where is the construction difficulty?
Two places: first, Bending radius of curved surfaces; a sample must be confirmed first; second, Relative position of the light strip slot and the wall surface, the axis of the light trough must align with the curved surface, otherwise the lighting will amplify the curvature deviation. It is recommended to mark the light trough position in the drawings during the layout stage.
Dozens of units of the same layout: how do you ensure visual consistency?
Use the same batch of material for the same wall in the same layout; and prepare sufficient material in one go (including waste). The estimated budget for this project is approximately 620㎡, with approximately 682㎡ of material prepared, requiring 3 boxes at 250.2㎡ per box. During construction, it is recommended to proceed in batches by floor or unit type to facilitate color difference comparison.
IX. Project File and Contact Information
| Project file | Content |
|---|---|
| Project type | Hotel guest rooms |
| Materials used | Sunset Golden Mountain (Golden Yellow) (Art and Three-Dimensional Texture Series) |
| Material specifications | 1220×2930mm | thickness 2.5–3.5mm | single piece about 17kg |
| Packaging | 70 Sheets/Case | Approximately 250.2㎡/Case |
| Construction process | Full bonding method, direct wall installation after leveling, no keel required |
| Implementation standards | JG/T 540-2017 'Building Flexible Stone-faced Decorative Material' |
| Project location | Jiangyou City, Sichuan Province |
| Wall area | Approx. 620 ㎡ (◆ preliminary estimate) |
| Actual photo record | 9 pieces |
Chengdu Igoods Technology Co., Ltd. (IGOODS) Flexible Stone · PU stone skinwall panel · wood paneling wall · WPC grid panel · Same color wall cabinet door
- Phone / WeChat / WhatsApp: 19136341389
- Email: 19136341389@163.com
- Address: Room 9001, 9th Floor, Building A, No. 166 Laifeng 5th Road (Laifeng Digital Innovation Center), Wuhou District, Chengdu, Sichuan Province, China
- Services: Free sample delivery · Selection advice · Project quotation · Installation guidance · After-sales response
Content and scope statement: This page records the wall material selection and construction process for this hotel guest room. The material specifications, performance parameters and applicable standards in the text all come from IGOODS product materials and can be verified independently; values marked "★ Engineering Experience" are common industry practices and empirical ranges and are not cited as national standard data; those marked "◆Estimate" are estimated values for area, schedule, and cost calculated according to common industry magnitudes, used to judge the order of magnitude, not measured bills; actual values are subject to project confirmation. The cost section is only used to explain the pricing logic and does not represent an actual bill. The full text contains no performance promises, price promises, or brand rankings. Images are used to display materials and spatial applications; communication materials must be verified against original records and are not to be used as customer acceptance or measured proof.
Relevant Materials and Solutions
Flexible Stone Solutions Selection Guides Request sample quotationFind the appropriate wall expression for your project.
Provide the type of space, wall area, and design intention. Communicate about materials, samples, and quotations.