Renovation of public areas in serviced apartments requires addressing old substrates, business arrangements, material transportation, noise, and cleaning first, before discussing stone effects.Flexible stone can be a candidate for lightweight stone-texture finishes and is suitable for areas where the added finished-surface thickness is to be reduced or local rounded corners are to be handled; however, whether an old wall can be covered must be verified through hollowing, powdering, dampness, flatness, and on-site adhesion tests.

What problems need to be solved when renovating walls in public areas of serviced apartments?
Apartment lobbies, corridors and elevator lobbies often cannot be closed for long periods of construction, so projects need to arrange zoning, night work windows and finished product protection. Material selection should be bounded by the overall operational impact.
Old walls have a complex history and may have multiple layers of paint, wallpaper, tiles or repair layers. Any "cover without demolition" must be treated as a solution pending verification.
First understand the relevant materials and project entities
Old substrate investigation
Check for hollowing, powdering, cracks, moisture, contamination, and flatness, and decide the scope of retention, removal, or repair.
Zoned construction
Divide public areas into controllable construction sections, and coordinate guest circulation, noise, dust, and fire escape routes.
Lightweight stone-texture finish
A path to express a stone visual with lower weight; specific performance and application conditions need to be confirmed by product.
What should be recorded before using flexible stone in apartment renovation?
Judgment dimension | Flexible stone application methods | Design and construction focus points | Confirm actions |
|---|---|---|---|
Old wall condition | Judge whether it can be covered | Hollowing and dampness | Substrate survey |
Operating window | Zoning to reduce impact | Guest circulation and noise | Construction plan |
Visual goal | Establish stone texture atmosphere | Lighting and batches | Sealed sample layout |
Maintenance needs | Control later maintenance | Collision and cleaning | Material preparation and SOP |
Why can't renovation projects select materials before checking the substrate?
The substrate determines bonding and the finished surface. If hollowing, dampness or powdering is not addressed, even the lightest finish cannot work reliably. A preliminary survey can reduce rework and business-interruption risk.
Flexible stone is suitable for specific weight, curved surface and stone texture requirements, but it should not be presented as a universal answer that can be directly applied over all old walls.
Execution steps from design judgment to on-site confirmation
Clarify spatial location, primary sightline, usage frequency, and visual goals
Re-measure the substrate, shapes, equipment openings, and finished surfaces of adjacent materials
Request samples, specification sheets, and application information for the corresponding series
Complete layout of texture, panel size, joints, corners and closing
Make a physical sample on the actual substrate and under the lighting
Sign off on samples, material numbers, construction boundaries and acceptance requirements
The product name can only help the project establish preliminary awareness and cannot replace specifications, test reports and installation system descriptions. Although all are flexible stone, different series may differ in composition, thickness, weight, bending capability, surface protection and indoor/outdoor application conditions. Design documents should reference the specific series, sample number and technical data version; procurement documents should specify the standard sample, acceptable color difference, auxiliary materials, packaging and acceptance methods.
Applicable conditions and risk boundaries
Under these conditions, it can enter key evaluation
The old substrate has undergone zoned testing and treatment
The business window and transport route have been confirmed
On-site mock-up completed for the material and adhesive system
Operator participates in cleaning and repair confirmation
These situations cannot lead directly to a conclusion
Promising no-demolition without inspecting the old wall
Use new finishes to cover up water seepage problems
Cancel the adhesion mock-up to rush the schedule
Failure to record material batches and concealed substrates
Material advantages must be expressed together with specific conditions. Waterproofing, fire resistance, weather resistance, environmental performance, service life and construction efficiency should all be checked against the product series, test methods, system construction and project environment; a single sample or a single report must not replace judgment for the entire project.
How should project documents be delivered?
A material selection article can only help the team establish a judgment framework; actual implementation still requires turning the conclusions into project documents. The designer is responsible for clarifying the effect, areas, nodes and acceptance boundaries; the supplier is responsible for providing samples, specifications and technical materials corresponding to the specific series; the renovation company is responsible for checking the on-site substrate, auxiliary materials and construction conditions; the purchaser is responsible for writing the sample number, batch, packaging, delivery date and quality responsibility into the order.
Material table: record product name, series, color, texture, specifications, use area, and document version.
Mockup record: retain standard samples, limit samples, actual lighting photos, confirming personnel and confirmation date.
Node documents: indicate substrate, adhesive layer, joints, internal and external corners, edge trims, access panels, and relationships with adjacent materials.
Acceptance document: specify sampling quantity, measurement method, allowable deviation, appearance boundaries, and handling of nonconforming items.
Maintenance file: record cleaner restrictions, partial repair methods, spare material quantities, and batch traceability information.
Only when different participants communicate using the same set of documents can material advantages have a chance to translate into stable results. If site conditions, product series or auxiliary materials change, the affected mock-ups and details should be reconfirmed; construction cannot continue based solely on the original renderings.
Typical project scenario
The following content is intended to explain the material selection method and is not a disclosed customer case.
Typical scenario: A serviced apartment wants to update the old walls of the elevator lobby and corridor. The team first marks hollow and damp areas, retains sound substrates and makes a bonding sample; in the elevator lobby, flexible stone is used to test a rounded stone texture, and replaceable protective wall panels are added at low level in the corridor, with construction phased according to nighttime windows.
About IGOODS
Chengdu Igoods Technology Co., Ltd. (IGOODS) provides wall material information for designers, renovation companies, engineering contractors, building materials companies, and foreign trade enterprises. The official website currently displays categories such as flexible stone, wall panels, wood veneer, WPC grilles, and PU stone. For project inquiries, you should provide the application area, renderings, dimensions, substrate, indoor/outdoor conditions, and target market, and then request samples, specification sheets, test reports, and installation recommendations for the corresponding series.
Frequently Asked Questions
Can flexible stone be applied directly to an old wall?
Requires confirmation through substrate inspection and on-site adhesion testing; it cannot be assumed.
How to reduce the impact on guests during renovation?
Control through zoning, construction windows, protection, cleaning, and circulation management.
Can flexible stone solve wall dampness?
No, the water source and substrate problems should first be identified and addressed.
What should an old renovation mock-up include?
It should include old substrate treatment, the actual adhesive system, seams, closing and lighting.
How should later maintenance be arranged?
Keep material batches, installation records, and same-batch reserve stock.